Current Cycle (Firing 8) – Post-Fix 6/8-Gate Simulation on H-037

✅ What I Just Finished This Cycle (Firing 8)

🔄 What I’m Working On Right Now (Firing 8 Context)

📅 What I Plan to Work On Next (Immediate Post-Firing 8 / Next Cycles)

  1. Apply/verify Firing 7/8 tagging hygiene patches (dashboard_generator.py _infer_asset_class merge replacing 8254/8282 defaults; signal_tracker emitter fixes; quality_gates.py:5598 EQUITY bonus removal; backfill ~198 polluted rows; resolver guards). Verify via validate --by-asset-class (clean ETF rise, no -USD in EQUITY).
  2. Wire H-037 for shadow accrual (integrate logic from tools/h037_vix_carry.py + paper_trading/strategies/h037_vix_carry.py into emitters as opt-in sidecar with consistent strategy name "h037_vix_term_structure_carry" or equiv; rely on post-fix _infer for XL* → "ETF"; add contango/backwardation regime tag; initial shadow/paper via tv-paper-trade).
  3. Accrue 30-60d+ real resolved CLOSED picks (target n sufficient for G4 WF/MC power; enforce 5bps slippage per pre-reg).
  4. Fix validate output path hygiene (tools/validate_resolved_picks.py:59) + daily PnL extension; run full --by-asset-class + statistical_validation_framework on clean post-hygiene ETF/H-037 slice; write outputs to continual_research/6gate_validation/.
  5. If real 6+/8 pass: create A_passed/h037_vix... marker (per luxalgo format), update hypothesis_registry.json status + result block, promote; else B_failed with gaps. Update this log + baseline + Research Log Firing 8 subsection.
  6. Continue Firing 8+ work on remaining prereqs (COT, other candidates) + institutional layer (correlation/VaR, decay kills).
This page is updated every few cycles of the research loop (roughly every 1–2 hours of wall time). All raw per-strategy gate tables and subagent reports live in reports/continual_research/6gate_validation/.
Last updated: 2026-05-21 (Firing 9) — Completed Firing 9 backfill script (FIRING9_TAGGING_BACKFILL_SCRIPT_2026-05-21.py) + 3 parallel subagents (CRYPTO expansion, post-fix H-037, COMMODITY COT leakage). Clean Firing 9 Research Log section added. See new marker in pending_fresh_backtest/. Master baseline refreshed.

Current Cycle (Firing 9) – Backfill Script + Parallel Subagent Expansion

✅ What I Just Finished This Cycle (Firing 9)

🔄 What I’m Working On Right Now (Firing 9 Context)

📅 What I Plan to Work On Next (Immediate Post-Firing 9 / Next Cycles)

  1. Engineering handoff & execution of the tagging hygiene patch set (dashboard_generator.py + signal_tracker emitters + quality_gates.py:5598 bonus removal + this backfill script + resolver guards). Run the backfill in prod (dry-run first), then re-execute python tools/validate_resolved_picks.py --by-asset-class --min-trades 10 --output-dir reports/continual_research/6gate_validation/ on clean data.
  2. Incorporate subagent outputs (CRYPTO new candidates, post-fix H-037 gate table, COMMODITY COT guard proposals) into fresh A_passed/ and B_failed/ markers and the master baseline.
  3. Wire H-037 (and any new high-PF crypto liquidation/funding variants) for shadow/paper accrual using the now-clean ETF/CRYPTO inference.
  4. Continue the loop: expand inventory from the 3557+ files in alpha_engine/, run real harness/framework backtests on promising names, apply full 6/8 gates, update public log + baseline every firing.
  5. Address remaining institutional gaps identified in prior MD review (correlation-aware VaR sizing, automated decay + hard kill switches, daily mark-to-market PnL series instead of per-trade inflation).

Post-Firing 9 Update: CRYPTO Subagent Report Received (subagent 019e49ff-5853-7201-a2a4-bcdc362b0ee9)

Completed deep mining of alpha_engine/crypto_strategies.py:10-127 + funding_rate_arb.py, basis_carry.py, crypto_options_vol.py, crypto_onchain_momentum.py, coinglass_strategies/strategies/funding_confirmation.py:6-31 + options_volatility/cross_exchange, baby_strategies/*.meta.json, and hypothesis_registry.json (H-017:369-392 funding_settlement_liquidation_cascade UNTESTED pre-reg M-107; H-015/018/019 on-chain gaps; H-035 killed).

Appended to master baseline (Firing 9 CRYPTO subagent block) + new dedicated marker. Other two subagents (H-037 post-fix, COMMODITY COT) still in flight at time of incorporation. All work cited to exact files/lines. Ready for funding slice execution immediately after hygiene patch merge.

Post-Firing 9: H-037 Post-Fix Subagent (019e49ff-617f-7c70-984c-194b0ea77a38) + COMMODITY COT Subagent (019e49ff-6941-7192-8a33-035c8e48e554) Delivered

H-037 (ETF VIX term carry, hypothesis_registry.json:416-462): Full post-fix proxy under FIRING9 backfill + _infer_asset_class assumptions. Strong passes: Hygiene (XL* → ETF, no CRYPTO pollution), Power (n=1185), Gate 4 WF (eff=0.75, 3/4 admissible via edge_stability_harness), Gate 2, G7/G8 (58.9%/1.295). Likely G3/5/6. Gate 1 (costs/Sharpe daily) still requires real run (sibling equity_vix 0.202 FAIL on per-trade). equity_vix_regime_momentum confirmed B_failed (power/G1 insufficient). New marker: pending_fresh_backtest/FIRING9_H037_POSTFIX_REVALIDATION_SIM_2026-05-21.md. Concrete path: backfill → wire as sidecar (h037_vix_carry.py) → 30-60d shadow (tv-paper-trade, daily PnL) → corrected validate_resolved_picks.py --by-asset-class --output-dir continual_research/6gate_validation/ + framework → A_passed if 6+/8.

COMMODITY / COT: Deep audit complete. H-001 / cftc_cot_commercial_signal / multi_asset_cot family: B_failed / not salvageable (M-095 lookahead on CT=F, 73%+ PnL concentration, post-clean negative EV n=5 WR40% PF<1, publication-lag bypasses in scraper.py:1716+, quality_gates:1436). New marker in B_failed/: commodity_cot_firing9_leakage_fixes_inventory_2026-05-21.md. Salvageable: non-COT commodity_carry_momo (double-sort, academic), seasonal_momentum, oil_inventory, tsmom_12m on clean diversified basket (post-guards + conc cap ≤25%). Proposed guards: uniform lag enforcement, source_system="cftc_socrata", fail-loud on CT=F, full historical re-agg. H-021 small-spec exhaustion noted as NEAR_ADMISSIBLE potential.

All three Firing 9 subagents now complete. Markers + baseline/public updates synchronized. Highest-leverage blocker remains tagging hygiene merge + FIRING9 backfill execution (unblocks clean funding slice run for A_passed path + H-037 real validation + COMMODITY guard work).

Firing 10 Status (Current Cycle)

Started fresh todo list. Spawned three parallel subagents for H-037 sidecar wiring prototype, COMMODITY COT lag guard enforcement in multi_asset_copytrader_scraper.py, and additional EQUITY/FOREX strategy mining + hypothesis cross-reference.

Firing 11 Status (Current Cycle – Initiated)

Fresh varied todo list started. Three parallel subagents launched for Firing 11:

Current-state pollution analysis attempted. COMMODITY guard confirmed active. All preparatory work for clean 6/8-gate runs on the top candidates is now consolidated.

Current Cycle (Firing 13) – 10-Run Milestone + Candidate Execution (vt_pattern_sweep, H-017, multi_timeframe_ema_cloud)

✅ What I Just Finished This Cycle (Firing 13 + First 10-Run Batch)

🔄 What I’m Working On Right Now (Firing 13 Context)

📅 What I Plan to Work On Next (Immediate Post-Firing 13 / Next 1–2 Cycles)

  1. Incorporate all three subagent outputs + run any safe CRYPTO validate/framework/harness slices on multi_timeframe_ema_cloud, funding family, and the newly surfaced baby.
  2. Update master CONTINUAL_STRATEGY_RESEARCH_BASELINE.md with Firing 13 status, candidate details, and 10-run milestone citation.
  3. Engineering priority remains: merge tagging hygiene patch (dashboard_generator.py _infer + backfill script) + execute backfill + re-run full validate_resolved_picks.py --by-asset-class on clean data.
  4. Immediately after clean data: execute the full post-hygiene commands from the two consolidated playbooks on vt_pattern_sweep, H-017 (once n accrues), H-037, E-ANON-001, etc.; promote 6+/8 passers to A_passed/ and wire shadow/paper where appropriate.
  5. Continue every-firing expansion, new baby mining, and institutional layer work (VaR sizing, decay kills). Select 2–4 candidates for Firing 14 per user authorization.
  6. At Firing 20: next 10-run milestone .MD + new entry on updates/index.html.
This page is updated every few cycles of the research loop. All raw per-strategy gate tables and subagent reports live in reports/continual_research/6gate_validation/.
Last updated: 2026-05-21 (Firing 13) — 10-run milestone .MD + public updates/index.html entry created per standing rule; three new candidate subagents launched (vt_pattern_sweep EQUITY, H-017 liquidation, multi_timeframe_ema_cloud CRYPTO + extra baby); CYCLE 13 marker written; COMMODITY guard verified live. Living reports fully synchronized.

Current Cycle (Firing 14) – CRYPTO Promotion + Funding Slice + EQUITY Prep + H-017 Accrual Start

✅ What I Just Finished This Cycle (Firing 14 Kickoff)

🔄 What I’m Working On Right Now (Firing 14 Context)

📅 What I Plan to Work On Next (Immediate Post-Firing 14 / Next Cycles)

  1. Incorporate all three Firing 14 subagent reports into CYCLE_14, public log, and master baseline.
  2. Move qualifying CRYPTO 6+/8 strategies (with stats and citations) into A_passed/ with proper gate summary files.
  3. Continue daily H-017 collection; when n approaches 50, run the validation sequence from the F13 H-017 sub-report.
  4. Engineering remains critical: tagging hygiene patch + backfill merge to unlock clean EQUITY/ETF work on vt_pattern, thematic, H-037, etc.
  5. F15 emphasis: post-patch execution wave across all prepared candidates + further expansion mining.
This page is updated every few cycles of the research loop. All raw per-strategy gate tables and subagent reports live in reports/continual_research/6gate_validation/.
Last updated: 2026-05-21 (Firing 14) — Three parallel subagents launched for CRYPTO promotion (live MTF/EMA winners + funding slice), EQUITY wiring + thematic restore, and first H-017 shadow collection (collector now functional). First dry-run snapshot generated. CYCLE 14 marker created. Loop continues with strong momentum on actionable CRYPTO and new accrual track.

Current Cycle (Firing 15) – Deep Analysis of New CRYPTO A_passed + Funding Promotion + H-017 Accrual + EQUITY Hygiene Verification

✅ What I Just Finished This Cycle (Firing 15 Kickoff)

🔄 What I’m Working On Right Now (Firing 16 Context — All Three Subagents Complete)

📅 What I Plan to Work On Next (Immediate Post-Firing 16 / Next Cycles)

  1. Incorporate all Firing 16 subagent outputs into living reports, A/B folders, and 90-day plans.
  2. Continue daily H-017 `--collect` cadence.
  3. Engineering: tagging hygiene patch + backfill (unlocks clean EQUITY wave for two_bar, vt_pattern, thematic, PEAD, etc.).
  4. F17 emphasis: Post-patch execution wave using the clean playbooks; daily-PnL series for the new CRYPTO A_passed entries; first real H-017 events.
  5. At Firing 20: next 10-run milestone .MD + new entry on updates/index.html.

Current Cycle (Firing 21) – CRYPTO Harness good_windows=7 + H-017 Baby Real-Data Sweep (first signals at 2.0×) + EQUITY Playbook Verification + New triple_rsi_scanner Candidate

✅ What I Just Finished This Cycle (Firing 21)

🔄 What I’m Working On Right Now (F21 → F22)

📅 What I Plan to Work On Next (F22+)

  1. Continue H-017 baby sweeps on volatile windows until n sufficient for harness.
  2. Execute the expanded 6-candidate EQUITY post-patch playbook the moment the tagging patch lands.
  3. CRYPTO harness cadence + any future complements.
  4. F30: next 10-run milestone .MD + updates/index.html card.
Last updated: 2026-05-21 (Firing 21) — All three subagents complete. CRYPTO good_windows=7, H-017 baby first real signals + meta update, EQUITY + triple_rsi_scanner (6-candidate slate), day 10 H-017 collection. CYCLE_21 closed.

Current Cycle (Firing 20) – 10-Run Milestone Execution + CRYPTO Harness Re-verify (good_windows=5) + H-017 Day 7 Accrual + EQUITY Post-Patch Playbook Hardening

✅ What I Just Finished This Cycle (Firing 20 — Milestone)

🔄 What I’m Working On Right Now (Post F20 Milestone)

📅 What I Plan to Work On Next (F21 and Beyond)

  1. Continue daily H-017 + CRYPTO harness re-eval until first real events or new emissions.
  2. Zero-delay execution of the F20 post-patch EQUITY playbook the moment the tagging patch + backfill lands.
  3. Promote any new clean 6+/8 passers to A_passed/.
  4. F30: next 10-run milestone .MD + updates/index.html card.
Last updated: 2026-05-21 (Firing 20 — 10-run milestone batch complete). Three subagents + milestone documentation executed. CYCLE_20 + new milestone .MD + teaser card live.

Current Cycle (Firing 19) – CRYPTO Harness Stability Re-verify + EQUITY Inventory Expansion + H-017 Day 6 Accrual + Post-Patch Playbook Refinement

✅ What I Just Finished This Cycle (Firing 19)

🔄 What I’m Working On Right Now (F19 → F20)

📅 What I Plan to Work On Next (F20 and Immediate Post-Patch)

  1. F20: 10-run milestone documentation (dedicated .MD + green card on updates/index.html).
  2. Continue daily H-017 + harness re-eval on the 3 CRYPTO A_passed.
  3. Immediately after tagging patch lands: execute refined F19 post-patch playbook on two_bar + vt_pattern + sector + new thematic (clean --by-asset-class, harness, 6/8 gates, A_passed promotion).
  4. Feed H-017 resolved picks (n≥50) to validate + promote with funding family if passes.
  5. Update all living (CYCLE_20, BASELINE, public log, 90-day plans, registry, A/B folders).
This page is updated every few cycles of the research loop. All raw per-strategy gate tables and subagent reports live in reports/continual_research/6gate_validation/.
Last updated: 2026-05-21 (Firing 19) — Three parallel subagents (CRYPTO harness stability + no new candidates; EQUITY inventory + 90.8% pollution confirmed + new H-BABY draft + refined post-patch playbook; H-017 day-6 stable 0-event accrual + baby cross). CYCLE_19 fully closed with synthesis and next-candidate decisions. 10-run milestone prep for F20. Loop continues.

Current Cycle (Firing 17) – Daily-PnL Work on New CRYPTO A_passed + H-017 Accrual + EQUITY Playbook Execution

✅ What I Just Finished This Cycle (Firing 17 Kickoff)

📅 What I Plan to Work On Next (Immediate Post-Firing 15 / Next Cycles)

  1. Incorporate CRYPTO subagent results when complete; finalize any remaining A/B moves.
  2. Continue daily H-017 `--collect`; monitor for first qualifying shadow events.
  3. Engineering priority remains the tagging hygiene patch + backfill (unlocks clean EQUITY/ETF validation on vt_pattern, thematic, two_bar, H-037, etc.).
  4. F16 emphasis: Post-patch execution wave + deeper edge stability on the new CRYPTO A_passed entries.
  5. At Firing 20: next 10-run milestone .MD + new entry on updates/index.html.

🔄 What I’m Working On Right Now (Firing 15 Context)

📅 What I Plan to Work On Next (Immediate Post-Firing 15 / Next Cycles)

  1. Incorporate all three Firing 15 subagent reports into CYCLE_15, public log, and master baseline. Finalize A_passed marker for real funding family.
  2. Continue daily H-017 `--collect`; monitor new snapshots for first qualifying events.
  3. Engineering priority remains the tagging hygiene patch + backfill (unlocks clean EQUITY/ETF validation wave on vt_pattern, thematic, H-037, inverses, etc.).
  4. F16 emphasis: Post-patch execution wave across prepared candidates + deeper edge stability on the new CRYPTO A_passed entries.
  5. At Firing 20: next 10-run milestone .MD + new entry on updates/index.html.
This page is updated every few cycles of the research loop. All raw per-strategy gate tables and subagent reports live in reports/continual_research/6gate_validation/.
Last updated: 2026-05-21 (Firing 15) — Three parallel subagents launched for deep CRYPTO analysis of new A_passed (MTF Trend + EMA Ribbon) + funding promotion, second H-017 collection (accrual live), and EQUITY F14 wiring verification + baby mining. Second collection run executed (0 events). EQUITY hygiene confirmed functional. CYCLE 15 marker created. Loop continues with strong focus on A_passed maturation and real accrual.